Update Calendar ICS adapter to 1.5.3.10-140416 (10)
This commit is contained in:
parent
d45eb8103d
commit
31cec068f0
|
@ -29,10 +29,15 @@ Repo:https://github.com/k3b/CalendarIcsAdapter.git
|
||||||
Build:1.5.3-140409,9
|
Build:1.5.3-140409,9
|
||||||
commit=v1.5.3
|
commit=v1.5.3
|
||||||
|
|
||||||
|
Build:1.5.3.10-140416,10
|
||||||
|
commit=v1.5.4.10
|
||||||
|
|
||||||
Maintainer Notes:
|
Maintainer Notes:
|
||||||
Jars used in 1.5.3 are the same ones that were used in org.dgtale.icsimport.
|
Jars used in 1.5.3 are the same ones that were used in org.dgtale.icsimport.
|
||||||
Check them again if they are changed. Will switch to source libraries or
|
Check them again if they are changed. Will switch to source libraries or
|
||||||
gradle deps soon.
|
gradle deps soon.
|
||||||
|
|
||||||
|
Note the incorrect tag on 1.5.3(4).10.
|
||||||
.
|
.
|
||||||
|
|
||||||
Auto Update Mode:None
|
Auto Update Mode:None
|
||||||
|
|
Loading…
Reference in a new issue